Chinese Quarterly Journal of Mathematics ›› 2022, Vol. 37 ›› Issue (4): 331-342.doi: 10.13371/j.cnki.chin.q.j.m.2022.04.001

    Next Articles

A Note on Preemptive Scheduling with Multiple Maintenance Activities to Minimize the Total Late Work

  

  1. 1. School of Management Engineering, Zhengzhou University of Aeronautics, Zhengzhou 450046, China; 2. School of Mathematics and Statistics, Zhengzhou University, Zhengzhou 450001, China; 3. School of Sciences, Henan University of Technology, Zhengzhou 450001, China
  • Received:2022-11-14 Online:2022-12-30 Published:2022-12-14
  • Contact: HE Ru-yan (1991-), female, native of Zhengzhou, Henan, lecturer of Zhengzhou University of Aeronautics, engages in scheduling theory; E-mail:heruyan219@163.com
  • About author:HE Ru-yan (1991-), female, native of Zhengzhou, Henan, lecturer of Zhengzhou University of Aeronautics, engages in scheduling theory; YUAN Jin-jiang (1965-), male, native of Zhengzhou, Henan, professor of Zhengzhou University, engages in scheduling theory; ZHANG Yuan (1990-), female, native of Zhengzhou, Henan, lecturer of Henan University of Technology, engages in scheduling theory.
  • Supported by:
     Supported by National Natural Science Foundation of China (Grant Nos. 12071442, 12201186).

Abstract: We study the single-machine preemptive scheduling problem with multiple maintenance activities to minimize the total late work, in which the jobs must be processed in the time space not occupied by the maintenance intervals. For this problem, we present a polynomial algorithm to determine the optimal schedule and establish a formula expression to the optimal value. Moreover, our result is used to correct some minor errors in the literature related to the single-machine (preemptive or non-preemptive) scheduling with one maintenance activity to minimize the total late work. 

Key words: Scheduling, Late work, Maintenance intervals 

CLC Number: