Scheduling and Subcontracting under Parallel Machines

  

  1. 1. Deptartment of Mathematics, Changzhou Institute of Technology 2. Institute of Management Engineering, Shanghai Second Polytechnic University

  • Received:2011-05-06 Online:2012-12-30 Published:2023-03-16
  • About author:CHEN Rong-jun(1971-), male, native of Changzhou, Jiangsu, an associate professor of Changzhou Institute of Technology, Ph.D., engages in scheduling and its application; TANG Guo-chun( 1943-), male, native of Shanghai, a professor of Shanghai Second Polytechnic University, engages in scheduling and its application.
  • Supported by:
    Supported by the National Natural Science Foundation of China(70731160015); Supported the National Natural Science Foundation of Jiangsu Province(yw06037)

Abstract: In this paper, we study a model on joint decisions of scheduling and subcontracting, in which jobs(orders) can be either processed by parallel machines at the manufacturer in-house or subcontracted to a subcontractor. The manufacturer needs to determine which jobs should be produced in-house and which jobs should be subcontracted. Furthermore, it needs to determine a  production schedule for jobs to be produced in-house. We discuss five classical scheduling objectives as production costs. For each problem with different objective functions, we give optimality conditions and propose dynamic programming algorithms.

Key words: scheduling, subcontracting, dynamic programming, parallel machines