同时最小化具有相等加工时间的最大完工时间和加权总完工时间的序列分批排序问题
何程, 林浩, 豆俊梅, 慕运动
Bicriteria Scheduling on a Series-Batching Machine to Minimize Makespan and Total Weighted Completion Time with Equal Length Job
HE Cheng, LIN Hao, DOU Jun-mei, MU Yun-dong
数学季刊
.
2014, (2): 159
-166
.
DOI: 10.13371/j.cnki.chin.q.j.m.2014.02.001