数学季刊 ›› 2012, Vol. 27 ›› Issue (4): 590-597.

• • 上一篇    下一篇

平行机的排序与转包

  

  1. 1. Deptartment of Mathematics, Changzhou Institute of Technology2. Institute of Management Engineering, Shanghai Second Polytechnic University

  • 收稿日期:2011-05-06 出版日期:2012-12-30 发布日期:2023-03-16
  • 作者简介:CHEN Rong-jun(1971-), male, native of Changzhou, Jiangsu, an associate professor of Changzhou Institute of Technology, Ph.D., engages in scheduling and its application; TANG Guo-chun( 1943-), male, native of Shanghai, a professor of Shanghai Second Polytechnic University, engages in scheduling and its application.
  • 基金资助:
    Supported by the National Natural Science Foundation of China(70731160015); Supported the National Natural Science Foundation of Jiangsu Province(yw06037)

Scheduling and Subcontracting under Parallel Machines

  1. 1. Deptartment of Mathematics, Changzhou Institute of Technology 2. Institute of Management Engineering, Shanghai Second Polytechnic University

  • Received:2011-05-06 Online:2012-12-30 Published:2023-03-16
  • About author:CHEN Rong-jun(1971-), male, native of Changzhou, Jiangsu, an associate professor of Changzhou Institute of Technology, Ph.D., engages in scheduling and its application; TANG Guo-chun( 1943-), male, native of Shanghai, a professor of Shanghai Second Polytechnic University, engages in scheduling and its application.
  • Supported by:
    Supported by the National Natural Science Foundation of China(70731160015); Supported the National Natural Science Foundation of Jiangsu Province(yw06037)

摘要: In this paper, we study a model on joint decisions of scheduling and subcontracting, in which jobs(orders) can be either processed by parallel machines at the manufacturer in-house or subcontracted to a subcontractor. The manufacturer needs to determine which jobs should be produced in-house and which jobs should be subcontracted. Furthermore, it needs to determine a  production schedule for jobs to be produced in-house. We discuss five classical scheduling objectives as production costs. For each problem with different objective functions, we give optimality conditions and propose dynamic programming algorithms. 

关键词: scheduling, subcontracting, dynamic programming, parallel machines

Abstract: In this paper, we study a model on joint decisions of scheduling and subcontracting, in which jobs(orders) can be either processed by parallel machines at the manufacturer in-house or subcontracted to a subcontractor. The manufacturer needs to determine which jobs should be produced in-house and which jobs should be subcontracted. Furthermore, it needs to determine a  production schedule for jobs to be produced in-house. We discuss five classical scheduling objectives as production costs. For each problem with different objective functions, we give optimality conditions and propose dynamic programming algorithms.

Key words: scheduling, subcontracting, dynamic programming, parallel machines